Current Location:Home - News - Industry
|
|||
Published:2021.01.20 News Sources:Qingdao Gute Ship Supplies Co., Ltd. Views: | |||
Guangdong COSCO Shipping Heavy Industry Co., Ltd. 's "docking" of six ships into three docks
In the first three days of 2021, six ships from three docks, "Cuihuashan", "Feilongshan" and "Ocean No. 2", successfully completed their respective representative "docking" projects, which opened a new atmosphere for COSCO Shipping Heavy Industry Shipyard Repair in Guangdong to enter the New Year. Daqing 226 and Zhongtiejun 17 of Feilongshan docks were dismantled within 78 hours and docked on January 2nd. Ocean II was docked on 3 January by the Marine Auxillary Vessel Hine 322 and Flamingo. The steward team led the team to overcome the adverse effects of the special ship type and the cold weather with their own high standards and strict requirements, strictly followed the requirements of the shipowner, successfully completed the bilge keel modification and painting, and won the trust of the European shipowner. Six ships dock together, showing the team fighting ability, everyone is good. In 2021, COSCO will continue to take "docking one hour ahead and sailing one day ahead" as the goal, self-pressure, docking one by one, ship by ship, deep tap potential, and make contribution to stronger and better ship repair. |
|||
This Paper Is Divided Into 1 Page | |||
Next:Red Star Shipyard begins construction of second ARC7 icebreaker LNG carrier | |||
Previous:Three main ship type transport market prospect | |||