Current Location:Home - News - Industry
|
|||
Published:2021.09.07 News Sources:Qingdao Gute Ship Supplies Co., Ltd. Views: | |||
First time in China! Shanghai CoSCO Shipping Heavy Industries completed the five-year special inspection of SINOenergy Fushi
Built by Hudong Zhonghua Shipbuilding Group, CNP Fusi is the largest GTT thin film LNG carrier in China with a LNG loading capacity of 174,000 cubic meters. It is operated and managed by CoSCO Shipping Energy Hong Kong CNP and Sinopec. The ship's liquid cargo containment system is composed of more than 5600 pieces of thin-film tile steel with low expansion coefficient and low temperature resistance of -163 degrees Celsius, of which more than 2800 pieces are only 0.7mm thick. The length of weld of the whole ship's tile steel is more than 150 km. It is difficult to work in a liquid cargo tank with a thickness of 0.7mm and without any mistakes. Prior to this, the special inspection of this type of ship has been carried out abroad. In recent years, IN the process of enterprise reform and development, COSCO Shipping Heavy Industry co., Ltd. has taken the initiative to adapt to the market change, accelerated the transformation and upgrading of product structure, and kept thinking about high-tech content and high value-added business, and has completed the routine repair of several LNG ships. In November 2020, Shanghai CoSCO Shipping Heavy Industry completed the repair of a series of large LNG ships "CNPC Wenzhou" and "CNPC Lianyungang", which is the first thin-film LNG carrier to be overhauled with open bulkhead based on its previous experience in LNG ship repair. Is different, the cosco shipping company in Shanghai "can the stone" on the wheel, the film type LNG ships from regular maintenance to cross check the repair quality, take concrete actions to practice "in the country of the youngsters who usually made", in order to ensure the security of national energy made a positive contribution, also for cosco shipping heavy industry ChengXiu international large LNG ship to further consolidate the foundation, In the enterprise development process has the important milestone significance. |
|||
This Paper Is Divided Into 1 Page | |||
Next:Whampoa Wenchong delivered the second 6000 sq m self-propelled suction dredger | |||
Previous:The alternative order for 2 210,000 tons bulk carriers of BSIC has been confirmed to come into effec | |||